Our References - Hilton Hotel Artvin Hopa Steel Construction Project
We designed, fabricated, and installed the structural steel framework for the main Hilton Hotel building in Hopa, Artvin, delivering high load-bearing capacity and seismic resilience.
For the main Hilton Hotel building in Artvin Hopa, we developed a steel superstructure system based on local soil conditions and regional seismic requirements.
Lattice trusses and a hybrid system seated on reinforced concrete supports provided long spans, stability, and balanced load distribution.
Solution & Implementation
End-to-end design, fabrication, and erection were coordinated under one team with detailed structural calculations and on-site sequencing for safe, fast installation.
Steel lattice trusses
Steel superstructure on reinforced concrete supports
Structural steel
Hybrid system
Hilton Hotel Artvin Hopa steel construction installation
Location
Artvin / Hopa
Structural system
Steel superstructure
Estimated duration
6-8 months
Scope
Design + Fabrication + Installation
Other Reference Projects
Yalova Çiftlikköy Additional Building Steel Hangar Project
We successfully completed an additional building hangar project of approximately 300 m² made of heavy steel for BenoPlast in Yalova Çiftlikköy.
CLK Çelik Barış, 2. Cd. Birlik sanayi sitesi NO:111 34520 Beylikdüzü/İstanbul, Türkiye
Certified Competence in International Standards
We ensure complete compliance with international standards in quality, environment, OHS, risk and social responsibility and prove this with our certificates.