Our References - Yalova Çiftlikköy Additional Building Steel Hangar Project

We successfully completed an additional building hangar project of approximately 300 m² made of heavy steel for BenoPlast in Yalova Çiftlikköy.

Client
BenoPlast
Year
Service
Heavy steel hangar, industrial additional building construction

Project Overview

An approximately 300 m² heavy steel hangar project was carried out for BenoPlast in Yalova Çiftlikköy. The priority in the project was to ensure durability, longevity, and functionality together.

Solution & Implementation

  • Heavy steel hangar application
  • Industrial additional building construction
  • Final touch-ups and painting
  • Durable and long-lasting structure
300 m² heavy steel additional building project completed for BenoPlast in Yalova Çiftlikköy

We successfully completed the heavy steel hangar project we carried out for BenoPlast in Yalova Çiftlikköy. May it be beneficial to them, may they use it with joy.

Ahmet
CLK Steel CEO
Project area
300 m²
Structure type
Heavy steel
Project status
Completed
Scope
Industrial hangar + Additional building
Other Reference Projects

Hilton Hotel Artvin Hopa Steel Construction Project

We designed, fabricated, and installed the structural steel framework for the main Hilton Hotel building in Hopa, Artvin, delivering high load-bearing capacity and seismic resilience.

Read reference project

Doubling the Area with Steel Mezzanine

In a workplace with a ceiling height of 7 m, the area was increased from 300 m² to 600 m² with steel mezzanine application

Read reference project

Tell us about your project

Our Office

  • CLK Çelik
    Barış, 2. Cd. Birlik sanayi sitesi NO:111
    34520 Beylikdüzü/İstanbul, Türkiye
Certified Competence in International Standards

We ensure complete compliance with international standards in quality, environment, OHS, risk and social responsibility and prove this with our certificates.

  • ISO 45001:2018
  • ISO 9001:2015
  • ISO 10002:2018
  • ISO 14001:2015
  • ISO 26000:2021
  • ISO 31000:2018